How long does a kitchen renovation take?

A simple guide to kitchen refit timings, stage by stage, so you know how long you'll be without a kitchen.

Oven and gas hob inside a temporary kitchen pod

It's the first thing everyone asks: how long will I be without a kitchen? The honest answer is that it depends on the size of the job. Here's a rough guide to help you plan. Always check timings with your own fitter.

The short answer

  • Like-for-like refit1 to 2 weeksNew units and worktops in the same layout, with little plumbing or electrical work.
  • Full new kitchen3 to 4 weeksNew layout, new plumbing and electrics, plastering, flooring and tiling.
  • Knock-through or extension2 to 3 months+Structural work, building control and lots more trades.

Stage by stage

A typical full kitchen refit, once work starts on site:

  • 1. Strip-out1 to 2 daysThe old kitchen, tiles and sometimes flooring come out.
  • 2. First fix2 to 4 daysNew pipes, cables and sockets go in before the walls are finished.
  • 3. Plastering3 to 7 daysWalls and ceilings are plastered and left to dry.
  • 4. Flooring1 to 2 daysSome floors go down before the units, some after.
  • 5. Fitting units3 to 5 daysCabinets, doors and appliances go in.
  • 6. Worktops1 day to 2 weeksLaminate and wood go in quickly. Stone and quartz are measured once the units are in, then made to order.
  • 7. Second fix and finishing2 to 4 daysSink, taps, hob and sockets are connected, then tiling and decorating.

What causes delays

  • Waiting for parts. Units, appliances or worktops arriving late, or arriving damaged.
  • Stone worktops. These can't be measured until the units are fitted, then take time to make.
  • Drying time. Fresh plaster and screed need time to dry, especially in winter.
  • Surprises. Damp, rotten joists or old wiring often only show up once the old kitchen is out.

Planning tip: take your fitter's estimate and add a week. It's much less stressful than running out of time. If you're hiring a temporary kitchen, you can always extend.

Questions

How long does a kitchen renovation take?

As a rough guide, a straightforward like-for-like refit takes 1 to 2 weeks. A full new kitchen with new plumbing, electrics and plastering usually takes 3 to 4 weeks. Knocking through walls or building an extension can take 2 to 3 months or more.

What usually causes delays?

Late deliveries, waiting for stone worktops to be made, plaster taking longer to dry, and problems found once the old kitchen is out, such as damp or old wiring.

How long should I hire a temporary kitchen for?

Take your fitter's estimate and add a week. 4 weeks is our most popular hire, and you can extend if the pod is free.